
El Confital promenade
Gran Canaria
Application of Zoruflex BYO Eco Estabilizador along the El Confital promenade, beside the coast.
View projectSan Cristóbal de La Laguna, Tenerife
A pedestrian route with a natural finish integrated among the trees at Circuito Vita.
At Circuito Vita in La Laguna, we installed a 1.200 m² pedestrian path using Byo Eco Continuo Natural, designed to blend into the landscape and connect the route. The solution incorporates recycled glass and provides a seamless surface for pedestrian traffic. The work is carried out in collaboration with TRAGSA.
Natural paths · Byo Eco Continuo Natural

Gran Canaria
Application of Zoruflex BYO Eco Estabilizador along the El Confital promenade, beside the coast.
View project
Veneguera, Mogán, Gran Canaria
A project using Byo Eco Estabilizado in the natural surroundings of the Veneguera ravine.
View project
Telde, Gran Canaria
Application of Zoruflex Byo - Ecoestabilizador on Carretera del Corredor, in a project commissioned by Grupo Tragsa.
View project