CO₂ emissions in construction: how to reduce them through materials

BYOND Canarias ·

Reducing CO₂ emissions in construction starts with deciding what to retain, which materials to use and how to get them to site. Choosing quantities carefully, making use of recovered resources and planning maintenance allows action on specific project decisions.

BYOND team working in the laboratory

The building’s energy efficiency remains fundamental. Alongside it are the emissions associated with manufacturing materials, transporting and installing them, and replacing them during their service life.

The scale of the challenge is considerable: the United Nations Environment Programme’s 2025–2026 report attributes 37% of global emissions to the buildings and construction sector. Source: UNEP.

Where do a construction project’s emissions come from?

To choose useful measures, it helps to distinguish two areas:

Type of emissionsWhat they include
Embodied carbonMaterials and construction processes throughout their life cycle: production, transport, installation, maintenance, replacements and end of life.
Operational carbonEnergy consumed by building systems during use, such as heating, cooling and lighting.

A life-cycle approach brings both together. It helps assess a solution’s performance over the period studied, including the interventions needed to keep it in service. Source: WorldGBC.

Six material decisions to reduce emissions

1. Make use of what is already there when technically viable

The first question is which elements can continue to fulfil their function. Retaining, repairing or renewing a surface may reduce the need for new materials and for managing demolition.

For flooring, this decision requires checking the condition of the substrate and the intended use before choosing the intervention. Retention must be compatible with the performance required. The European Commission identifies refurbishment and better use of existing buildings among the measures to reduce emissions and demand for materials. Source: European Commission.

2. Compare materials that meet the same need

An environmental comparison needs a common basis. Check the function of each solution, the quantity it requires and the stages covered by the available information.

An Environmental Product Declaration —EPD— provides data for this assessment. Interpreting it requires checking its units, scope and comparison conditions. A figure per kilogram may not be enough to choose flooring if the alternatives require different quantities or configurations. Reference: International EPD System.

If you are reviewing basic materials, our guide to types of cement can help you understand their characteristics before studying the complete solution.

3. Incorporate recovered materials with a defined purpose

A recovered resource needs preparation and an appropriate use. It is worth knowing which raw material it replaces, what treatment it requires and how its suitability for the intended application is checked.

At BYOND we work with recovered glass that is prepared and characterised for incorporation into new solutions. Our R&D&I and sustainability page explains this journey, from treatment to studying the material.

The environmental assessment must include this preparation process alongside the raw material being replaced.

4. Review transport and supply logistics

For a project in the Canary Islands, it is useful to ask about materials’ origins, their journeys and the organisation of supply. Distance, mode of transport, load and the movements required all play a part in the assessment.

Proximity is a relevant factor within this comparison. Its effect must be studied alongside the material’s production and treatment. This is the approach used in the recovered-glass scenario explained below.

5. Adjust quantities and record what happens on site

Measurements, orders and delivery records help relate the design to material consumption. They also help identify losses and correct estimates using execution data.

A useful working basis brings together planned and actual quantities, origins, deliveries and waste generated. RICS’s life-cycle assessment methodology includes material quantities, transport and losses within the processes assessed. Reference: RICS.

6. Consider maintenance and future renewals

The study continues during use of the space. Consider how the solution will be maintained and what repairs or replacements it may need over the period considered.

For flooring, this means asking about cleaning, maintenance and the possibility of intervening in specific areas. The environmental assessment can include these activities alongside the initial impacts. Reference: WorldGBC.

The BYOND case: recovered glass and raw material supply

At BYOND we incorporate locally recovered glass into construction solutions. This work makes use of a resource available nearby and allows us to study replacing imported virgin raw materials. Find out more on our materials manufacturing in the Canary Islands page.

To explain its effect on supply, we have developed a scenario replacing 2,000 tonnes of imported silica per year with locally recovered glass.

The model’s central result is an estimated annual reduction of approximately 60 tonnes of CO₂e. The comparison includes production and transport of the reference silica and deducts the emissions expected from treating and locally transporting the glass.

The 2,000 tonnes define the basis of the scenario. The result relates to this raw material supply; assessing a specific product or project requires its own data.

See the “Recovered glass, lower emissions” section for an explanation of the scenario within Sustainability.

How to apply these decisions to your project

Before choosing a system, these questions help prepare the conversation with the supplier or technical team:

QuestionInformation worth gathering
Which parts of the substrate or space can be retained?Current condition, use and intervention needs.
What quantity and configuration does each alternative require?Measurement and description of the complete system.
Where does the material come from and how is it prepared?Origin, treatment and supply data.
What environmental documentation is available?Scope, units and conditions of the data.
How will the solution be maintained?Maintenance needs and possible renewals.

BYOND’s project references show applications in context. For example, the Las Palmas Cruise Terminal shows Zoruflex Continuo applied to an outdoor pedestrian route. The reference illustrates the system’s use; the supply-related CO₂ scenario is explained separately.

Frequently asked questions

Does a local material always have lower emissions?

The comparison needs to include its production or recovery, the treatment required and transport. These data allow the effect of proximity to be assessed for the supply being studied.

Can BYOND’s figure be used to calculate savings for any project?

The scenario of approximately 60 tonnes of CO₂e per year is linked to replacing 2,000 tonnes of raw material annually. Studying a project requires its quantities, materials and supply conditions.

Where should you start?

With the condition of the space and its intended use. You can then compare technically suitable solutions, their quantities, the available documentation and maintenance.

Are you planning construction work or renewing a floor?

Tell us where the project is, how the space will be used and the approximate surface area you want to work on. This information will help us direct the enquiry towards materials and systems that suit your case.